Fossil-Stafford #2 - Jackson County, Texas . jAlbum 10 Fossil-Stafford #2 - Jackson County, Texas DSC04016_0031 slides/DSC04016_0031.html# Mon, 19 Mar 2012 20:12:21 -0600 Fossil’s President, Dennis Kittler at the Stafford #2 stake marking off 900’ from the Stafford #1 well. Fossil’s President, Dennis Kittler at the Stafford #2 stake marking off 900’ from the Stafford #1 well. slides/DSC04016_0031.jpg DSC04018_0029 slides/DSC04018_0029.html# Mon, 19 Mar 2012 20:12:21 -0600 Photo of Neal Marek supervising the survey crew while staking the Stafford #2 well location 600’ West of the Stafford #1 well. Photo of Neal Marek supervising the survey crew while staking the Stafford #2 well location 600’ West of the Stafford #1 well. slides/DSC04018_0029.jpg DSC04019_0028 slides/DSC04019_0028.html# Mon, 19 Mar 2012 20:12:21 -0600 Photo of old abandoned gas sales line sign indicating the pipe line once crossed the Stafford Ranch. Photo of old abandoned gas sales line sign indicating the pipe line once crossed the Stafford Ranch. slides/DSC04019_0028.jpg DSC04021_0026 slides/DSC04021_0026.html# Mon, 19 Mar 2012 20:12:21 -0600 Photo from left to right: Gary Countryman (Mogul Energy), Judge Stafford (Land & Mineral Owner), and Don Timko (Fossil Geologist). Photo from left to right: Gary Countryman (Mogul Energy), Judge Stafford (Land & Mineral Owner), and Don Timko (Fossil Geologist). slides/DSC04021_0026.jpg DSC00075 slides/DSC00075.html# Mon, 19 Mar 2012 20:12:21 -0600 Drilling Operations of the Fossil-Stafford #2 Drilling Operations of the Fossil-Stafford #2 slides/DSC00075.JPG DSC00076 slides/DSC00076.html# Mon, 19 Mar 2012 20:12:21 -0600 Arrow Drilling Rig #6 drilling the Stafford #2 Well Arrow Drilling Rig #6 drilling the Stafford #2 Well slides/DSC00076.JPG DSC00077 slides/DSC00077.html# Mon, 19 Mar 2012 20:12:21 -0600 Photo of Stafford Lease Oil Storage (Tank Battery) Photo of Stafford Lease Oil Storage (Tank Battery) slides/DSC00077.JPG DSC00078 slides/DSC00078.html# Mon, 19 Mar 2012 20:12:21 -0600 Stafford Lease Production Facility (Heater-Treater, Meters, Vertical Seperators) Stafford Lease Production Facility (Heater-Treater, Meters, Vertical Seperators) slides/DSC00078.JPG DSC00079 slides/DSC00079.html# Mon, 19 Mar 2012 20:12:21 -0600 The Fossil-Stafford #1- Currently free flowing and producing. The Fossil-Stafford #1- Currently free flowing and producing. slides/DSC00079.JPG DSC00080 slides/DSC00080.html# Mon, 19 Mar 2012 20:12:21 -0600 Drilling Operations of the Fossil-Stafford #2 Drilling Operations of the Fossil-Stafford #2 slides/DSC00080.JPG DSC00081 slides/DSC00081.html# Mon, 19 Mar 2012 20:12:21 -0600 Arrow Drilling Rig #6 drilling the Stafford #2 Well Arrow Drilling Rig #6 drilling the Stafford #2 Well slides/DSC00081.JPG DSC00082 slides/DSC00082.html# Mon, 19 Mar 2012 20:12:21 -0600 Photo of drilling fluid (Mud) chemicals Photo of drilling fluid (Mud) chemicals slides/DSC00082.JPG DSC00083 slides/DSC00083.html# Mon, 19 Mar 2012 20:12:21 -0600 Arrow Drilling Rig #6 drilling the Stafford #2 Well Arrow Drilling Rig #6 drilling the Stafford #2 Well slides/DSC00083.JPG DSC00084 slides/DSC00084.html# Mon, 19 Mar 2012 20:12:21 -0600 Arrow Drilling Rig #6 drilling the Stafford #2 Well Arrow Drilling Rig #6 drilling the Stafford #2 Well slides/DSC00084.JPG DSC00085 slides/DSC00085.html# Mon, 19 Mar 2012 20:12:21 -0600 Photo of Substructure with Blowout Preventer underneath. Photo of Substructure with Blowout Preventer underneath. slides/DSC00085.JPG DSC00086 slides/DSC00086.html# Mon, 19 Mar 2012 20:12:21 -0600 Fossil’s President, Dennis Kittler on rig floor Fossil’s President, Dennis Kittler on rig floor slides/DSC00086.JPG DSC00087 slides/DSC00087.html# Mon, 19 Mar 2012 20:12:21 -0600 Photo of Drilling Fluid (Mud) system Photo of Drilling Fluid (Mud) system slides/DSC00087.JPG DSC00098 slides/DSC00098.html# Mon, 19 Mar 2012 20:12:21 -0600 Arrow Drilling Rig #6 drilling the Stafford #2 Well Arrow Drilling Rig #6 drilling the Stafford #2 Well slides/DSC00098.JPG DSC00097 slides/DSC00097.html# Mon, 19 Mar 2012 20:12:21 -0600 Photo of Stafford #2 Well location Photo of Stafford #2 Well location slides/DSC00097.JPG DSC00095 slides/DSC00095.html# Mon, 19 Mar 2012 20:12:21 -0600 Fossil Oil is “bullish” towards this #2 Well Fossil Oil is “bullish” towards this #2 Well slides/DSC00095.JPG DSC00154 slides/DSC00154.html# Mon, 19 Mar 2012 20:12:21 -0600 Fossil Drilling Engineer, E.J. Gilbert on site during drilling of Stafford #2 Well. Fossil Drilling Engineer, E.J. Gilbert on site during drilling of Stafford #2 Well. slides/DSC00154.JPG DSC00155 slides/DSC00155.html# Mon, 19 Mar 2012 20:12:21 -0600 Production Casing (4.5”) on pipe racks waiting for results of Open Hole logging. Production Casing (4.5”) on pipe racks waiting for results of Open Hole logging. slides/DSC00155.JPG DSC04721 slides/DSC04721.html# Mon, 19 Mar 2012 20:12:21 -0600 (left to right) Baker-Hughes Engineer, Ken Callis and Fossil’s Don Timko inside control truck logging Stafford #2 Well. (left to right) Baker-Hughes Engineer, Ken Callis and Fossil’s Don Timko inside control truck logging Stafford #2 Well. slides/DSC04721.JPG DSC04722 slides/DSC04722.html# Mon, 19 Mar 2012 20:12:21 -0600 Baker Hughes Logging Control Unit with satellite system. Baker Hughes Logging Control Unit with satellite system. slides/DSC04722.JPG DSC04723 slides/DSC04723.html# Mon, 19 Mar 2012 20:12:21 -0600 Baker Hughes Logging Tools Carrier Truck (Open Hole Log Tools and Formation Testers). Baker Hughes Logging Tools Carrier Truck (Open Hole Log Tools and Formation Testers). slides/DSC04723.JPG DSC04726 slides/DSC04726.html# Mon, 19 Mar 2012 20:12:21 -0600 Baker Hughes Formation Tester Supervisor on rig floor preparing to lower tool down hole to test zones. Baker Hughes Formation Tester Supervisor on rig floor preparing to lower tool down hole to test zones. slides/DSC04726.JPG DSC04724 slides/DSC04724.html# Mon, 19 Mar 2012 20:12:21 -0600 Technician emptying Formation Testing chambers to analysis gas pressure, amount and crude oil. Technician emptying Formation Testing chambers to analysis gas pressure, amount and crude oil. slides/DSC04724.JPG DSC04727 slides/DSC04727.html# Mon, 19 Mar 2012 20:12:21 -0600 (left to right) Drilling Engineer, E.J. Gilbert and Geologist, Don Timko over-seeing logging and formation testing. (left to right) Drilling Engineer, E.J. Gilbert and Geologist, Don Timko over-seeing logging and formation testing. slides/DSC04727.JPG DSC00214 slides/DSC00214.html# Mon, 19 Mar 2012 20:12:21 -0600 Photo of Stafford #2 wellbore receiving additional cement before initial completion begins. Photo of Stafford #2 wellbore receiving additional cement before initial completion begins. slides/DSC00214.JPG DSC00215 slides/DSC00215.html# Mon, 19 Mar 2012 20:12:21 -0600 Field crew using back hoe to keep wellhead straight as cement hardened around upper surface casing. Field crew using back hoe to keep wellhead straight as cement hardened around upper surface casing. slides/DSC00215.JPG DSC00221 slides/DSC00221.html# Mon, 19 Mar 2012 20:12:21 -0600 View of rig crew and wireline personnel commence running cement bond logs (CBL). View of rig crew and wireline personnel commence running cement bond logs (CBL). slides/DSC00221.JPG DSC00175 slides/DSC00175.html# Mon, 19 Mar 2012 20:12:21 -0600 Crane used to run Cement Bond Log. Crane used to run Cement Bond Log. slides/DSC00175.JPG DSC00177 slides/DSC00177.html# Mon, 19 Mar 2012 20:12:21 -0600 Wireline personnel had to work around remaining drilling rig equipment in order to log well. Wireline personnel had to work around remaining drilling rig equipment in order to log well. slides/DSC00177.JPG DSC00179 slides/DSC00179.html# Mon, 19 Mar 2012 20:12:21 -0600 Computer screen in logging control truck displaying the cement bond log (CBL). Computer screen in logging control truck displaying the cement bond log (CBL). slides/DSC00179.JPG 2011-11-03_1831 slides/2011-11-03_1831.html# Mon, 19 Mar 2012 20:12:21 -0600 Additional production equipment on site. Additional production equipment on site. slides/2011-11-03_1831.png IMG_2357 slides/IMG_2357.html# Mon, 19 Mar 2012 20:12:21 -0600 1/21/12- A tanker arrived to pick up a load of crude oil. 1/21/12- A tanker arrived to pick up a load of crude oil. slides/IMG_2357.JPG IMG_2394 slides/IMG_2394.html# Mon, 19 Mar 2012 20:12:21 -0600 Pumpjack on the Stafford Lease Pumpjack on the Stafford Lease slides/IMG_2394.JPG IMG_2595 slides/IMG_2595.html# Mon, 19 Mar 2012 20:12:21 -0600 View of B&L Oilfield Services of El Campo, Texas workover rig on Stafford #2 well. View of B&L Oilfield Services of El Campo, Texas workover rig on Stafford #2 well. slides/IMG_2595.JPG IMG_2597 slides/IMG_2597.html# Mon, 19 Mar 2012 20:12:21 -0600 Tubing Testers (Fitzpatrick Tubing Services of El Campo, TX) checking each joint of 4 ½”production tubing for leaks before going into the wellbore. Tubing Testers (Fitzpatrick Tubing Services of El Campo, TX) checking each joint of 4 ½”production tubing for leaks before going into the wellbore. slides/IMG_2597.JPG IMG_2602 slides/IMG_2602.html# Mon, 19 Mar 2012 20:12:21 -0600 Sucker Rods (3/4” and 7/8”) on float trailer waiting to be picked up and lowered into #2 wellbore. Sucker Rods (3/4” and 7/8”) on float trailer waiting to be picked up and lowered into #2 wellbore. slides/IMG_2602.JPG IMG_2601 slides/IMG_2601.html# Mon, 19 Mar 2012 20:12:21 -0600 This is the truck for the Fitzgerald Tubing Testing Services control unit used to test our production tubing before going in the hole. This is the truck for the Fitzgerald Tubing Testing Services control unit used to test our production tubing before going in the hole. slides/IMG_2601.JPG IMG_2605 slides/IMG_2605.html# Mon, 19 Mar 2012 20:12:21 -0600 Mogul Energy (Operator) Ed Banaszek on location during entire operation to hook up pump jack to #2 well. Mogul Energy (Operator) Ed Banaszek on location during entire operation to hook up pump jack to #2 well. slides/IMG_2605.JPG IMG_2607 slides/IMG_2607.html# Mon, 19 Mar 2012 20:12:21 -0600 View of final joint of tubing being held on rig floor by a set of slips. View of final joint of tubing being held on rig floor by a set of slips. slides/IMG_2607.JPG IMG_2608 slides/IMG_2608.html# Mon, 19 Mar 2012 20:12:21 -0600 With cloudy skies, a view of Cabot 320 pump jack ready to commence pumping. With cloudy skies, a view of Cabot 320 pump jack ready to commence pumping. slides/IMG_2608.JPG IMG_2611 slides/IMG_2611.html# Mon, 19 Mar 2012 20:12:21 -0600 Photo of (left to right) Neal Marek of NBC Oilfield, Ed Banaszek of Mogul Energy, and Tool Pusher for B&L Oilfield Services rig) reviewing the task at hand. Photo of (left to right) Neal Marek of NBC Oilfield, Ed Banaszek of Mogul Energy, and Tool Pusher for B&L Oilfield Services rig) reviewing the task at hand. slides/IMG_2611.JPG IMG_2613 slides/IMG_2613.html# Mon, 19 Mar 2012 20:12:21 -0600 Photo of Neal Marek (consultant with NBC Oilfield) taking with Ed Banaszek (Mogul Energy) concerning where to set the bottom hole pump in #2 well. Photo of Neal Marek (consultant with NBC Oilfield) taking with Ed Banaszek (Mogul Energy) concerning where to set the bottom hole pump in #2 well. slides/IMG_2613.JPG IMG_2617 slides/IMG_2617.html# Mon, 19 Mar 2012 20:12:21 -0600 Photo of Jackson County Electric’s main power pole and transformer supplying power to both Stafford #1 and #2 wells. Photo of Jackson County Electric’s main power pole and transformer supplying power to both Stafford #1 and #2 wells. slides/IMG_2617.JPG IMG_2618 slides/IMG_2618.html# Mon, 19 Mar 2012 20:12:21 -0600 Picture of Stafford #2 well’s electrical panel box and meter pole. Picture of Stafford #2 well’s electrical panel box and meter pole. slides/IMG_2618.JPG IMG_2615 slides/IMG_2615.html# Mon, 19 Mar 2012 20:12:21 -0600 Photo of Fitzgerald Tubing Services testing vehicle upon finishing testing all joints of tubing on location. Photo of Fitzgerald Tubing Services testing vehicle upon finishing testing all joints of tubing on location. slides/IMG_2615.JPG IMG_2596 slides/IMG_2596.html# Mon, 19 Mar 2012 20:12:21 -0600 VARIOUS PHOTOS OF B&L OILFIELD’S WORKOVER RIG. VARIOUS PHOTOS OF B&L OILFIELD’S WORKOVER RIG. slides/IMG_2596.JPG IMG_2598 slides/IMG_2598.html# Mon, 19 Mar 2012 20:12:21 -0600 VARIOUS PHOTOS OF B&L OILFIELD’S WORKOVER RIG. VARIOUS PHOTOS OF B&L OILFIELD’S WORKOVER RIG. slides/IMG_2598.JPG IMG_2600 slides/IMG_2600.html# Mon, 19 Mar 2012 20:12:21 -0600 VARIOUS PHOTOS OF B&L OILFIELD’S WORKOVER RIG. VARIOUS PHOTOS OF B&L OILFIELD’S WORKOVER RIG. slides/IMG_2600.JPG IMG_2347- slides/IMG_2347-.html# Mon, 19 Mar 2012 20:12:21 -0600 Group of Stafford JV investors from Denmark visit the Stafford wells in January, 2012. Group of Stafford JV investors from Denmark visit the Stafford wells in January, 2012. slides/IMG_2347-.JPG IMG_2345 slides/IMG_2345.html# Mon, 19 Mar 2012 20:12:21 -0600 Photo of Stafford #1 Wellhead prior to being hooked up to a pumping unit. Photo of Stafford #1 Wellhead prior to being hooked up to a pumping unit. slides/IMG_2345.JPG IMG_2364 slides/IMG_2364.html# Mon, 19 Mar 2012 20:12:21 -0600 View of the Stafford lease Production Facility with Barton gas meter in foreground. View of the Stafford lease Production Facility with Barton gas meter in foreground. slides/IMG_2364.JPG IMG_2353 slides/IMG_2353.html# Mon, 19 Mar 2012 20:12:21 -0600 Line Heater Unit installed and operating on the Stafford #2 well. Line Heater Unit installed and operating on the Stafford #2 well. slides/IMG_2353.JPG IMG_2358 slides/IMG_2358.html# Mon, 19 Mar 2012 20:12:21 -0600 Transport picking up load of oil from the Stafford Tank Battery early January, 2012. Transport picking up load of oil from the Stafford Tank Battery early January, 2012. slides/IMG_2358.JPG IMG_2373 slides/IMG_2373.html# Mon, 19 Mar 2012 20:12:21 -0600 Fossil Danish investors on Tank Battery’s cat walk enjoying their visit to the Stafford Lease…it’s a long trip but was worth it! Fossil Danish investors on Tank Battery’s cat walk enjoying their visit to the Stafford Lease…it’s a long trip but was worth it! slides/IMG_2373.JPG IMG_2369 slides/IMG_2369.html# Mon, 19 Mar 2012 20:12:21 -0600 Fossil Oil investor saying “seeing is believing”… now, “show me the money!” Fossil Oil investor saying “seeing is believing”… now, “show me the money!” slides/IMG_2369.JPG IMG_2371 slides/IMG_2371.html# Mon, 19 Mar 2012 20:12:21 -0600 View of the Stafford #1 wellhead from a top the Tank Battery (prior to hooking up pump jack). View of the Stafford #1 wellhead from a top the Tank Battery (prior to hooking up pump jack). slides/IMG_2371.JPG IMG_2372 slides/IMG_2372.html# Mon, 19 Mar 2012 20:12:21 -0600 View of the Stafford #2 wellhead from a top the Tank Battery (prior to hooking up pump jack). View of the Stafford #2 wellhead from a top the Tank Battery (prior to hooking up pump jack). slides/IMG_2372.JPG DSC00442 slides/DSC00442.html# Mon, 19 Mar 2012 20:12:21 -0600 Pumpjack (Cabot Model 320) being installed on Stafford #2 Pumpjack (Cabot Model 320) being installed on Stafford #2 slides/DSC00442.JPG DSC00443 slides/DSC00443.html# Mon, 19 Mar 2012 20:12:21 -0600 Pumpjack (Cabot Model 320) being installed on Stafford #2 Pumpjack (Cabot Model 320) being installed on Stafford #2 slides/DSC00443.JPG DSC00619 slides/DSC00619.html# Mon, 19 Mar 2012 20:12:21 -0600 Picture of Stafford #2 well’s Cabot Model 320 pumping unit in operation. Picture of Stafford #2 well’s Cabot Model 320 pumping unit in operation. slides/DSC00619.JPG DSC00621 slides/DSC00621.html# Mon, 19 Mar 2012 20:12:21 -0600 Side picture of Stafford #2 well’s Cabot Model 320 pumping unit in operation. Side picture of Stafford #2 well’s Cabot Model 320 pumping unit in operation. slides/DSC00621.JPG DSC00622 slides/DSC00622.html# Mon, 19 Mar 2012 20:12:21 -0600 Picture of Stafford #2 well head assembly. Picture of Stafford #2 well head assembly. slides/DSC00622.JPG DSC00624 slides/DSC00624.html# Mon, 19 Mar 2012 20:12:21 -0600 Frontal picture of Stafford #2 well’s Cabot Model 320 pumping unit in operation. Frontal picture of Stafford #2 well’s Cabot Model 320 pumping unit in operation. slides/DSC00624.JPG DSC00625 slides/DSC00625.html# Mon, 19 Mar 2012 20:12:21 -0600 Angle view of the Stafford #2 well pumping unit and wellhead in operation. Angle view of the Stafford #2 well pumping unit and wellhead in operation. slides/DSC00625.JPG DSC00627 slides/DSC00627.html# Mon, 19 Mar 2012 20:12:21 -0600 Side view of the Stafford #2 well pumping unit and wellhead in operation. Side view of the Stafford #2 well pumping unit and wellhead in operation. slides/DSC00627.JPG DSC00630 slides/DSC00630.html# Mon, 19 Mar 2012 20:12:21 -0600 Photo of Relief Pumper, Dean Adams, gauging the Stafford tank batteries for the daily production reading. Photo of Relief Pumper, Dean Adams, gauging the Stafford tank batteries for the daily production reading. slides/DSC00630.JPG DSC00632 slides/DSC00632.html# Mon, 19 Mar 2012 20:12:21 -0600 Close up view of measuring tape showing 9’+ (feet) of oil in tank #1. Close up view of measuring tape showing 9’+ (feet) of oil in tank #1. slides/DSC00632.JPG DSC00633 slides/DSC00633.html# Mon, 19 Mar 2012 20:12:21 -0600 View of Stafford #1 well pumping unit from the top of the tank battery. View of Stafford #1 well pumping unit from the top of the tank battery. slides/DSC00633.JPG DSC00635 slides/DSC00635.html# Mon, 19 Mar 2012 20:12:21 -0600 Photo of Dean Adams in his truck calculating the oil/gas/water production for that day. Photo of Dean Adams in his truck calculating the oil/gas/water production for that day. slides/DSC00635.JPG